Chain On-Prem Servers

As your Livepatch deployment grows, you may want to scale out beyond a single deployment.
This how-to document shows you how to chain multiple Livepatch on-prem servers together.

This is useful in a few scenarios:

  • Running the server in multiple availability zones or regions.
  • Isolating machines to a specific on-prem instance.
  • Increasing the scale of a deployment without HA.

In order to chain on-prem server you need:

  • An existing Livepatch on-prem server.
  • A new deployment of the Livepatch on-prem server.
  • The Livepatch admin tool setup against the existing server.

When deploying an instance of the Livepatch server (see our existing guides) you will normally use an Ubuntu Pro token to configure the on-premise server to sync with Canonical’s hosted Livepatch server.

In this scenario, we can skip that step as we will use a token provided by our existing Livepatch server.

Below we refer to the “upstream” server as the original Livepatch server and the “downstream” server as the new deployment that will sync from the “upstream”.

On the upstream server

Using the admin tool:

livepatch-admin sync-tokens add edge my-token

This will return a token that another on-prem server can use to sync patches.
Sync tokens, by default, do not expire but the --valid-until flag can be used to set an expiry date.

Change edge if you would like to sync from a different tier.

See our reference doc to better understand how tiers work and how patches are synced.

On the downstream server

Configure the following values on your charm/snap deployment:

  • Set patch-sync.token using the previously obtained token.
  • Set patch-sync.upstream-url to the upstream server URL.

You are now done configuring your downstream Livepatch server to sync from your upstream server.
This process can be repeated as many times as desired.

Syncing tiers (Optional)

Conventionally, each Livepatch on-prem server provides its own patch management using local tiers.
Patches can be promoted between tiers to provide phased rollouts.

To cater for scenarios where patch management should only be done in one place and synced to various downstream server, we offer the ability to sync tiers.

Enabling this feature will do the following:

  • Match a server’s tier structure to its upstream. This is a destructive operation and will remove any tiers that currently exist.

  • Sync patch tier info from the upstream server. A patch e.g. 100.1 promoted to the “stable” tier upstream will automatically be reflected in the downstream server.

  • Disables local patch management i.e. patches cannot be promoted between tiers and tiers cannot be created or destroyed through the admin tool.

This feature only needs to be enabled on the downstream server. No changes are needed on the upstream server.

Enable this functionality by setting the patch-sync.sync-tiers config value to true.

This page was last modified 2 months ago. Help improve this document in the forum.